首页> 外文期刊>Water and Energy International >SILT DAMAGE CONTROL MEASURES FOR UNDERWATER PARTS - NATHPA JHAKRI HYDRO POWER STATION - CASE STUDY OF A SUCCESS STORY
【24h】

SILT DAMAGE CONTROL MEASURES FOR UNDERWATER PARTS - NATHPA JHAKRI HYDRO POWER STATION - CASE STUDY OF A SUCCESS STORY

机译:纳斯帕贾克力水电站水下部件的淤塞控制措施-成功案例案例研究

获取原文
获取原文并翻译 | 示例
       

摘要

Hydro power plants located on the Himalayan Rivers, typically, have had to endure high silt content in the water passing through the turbines causing enormous damages to the under-water parts of the turbine. The hydro power generating companies are engaged in mitigating this menace and optimizing generation and profits. The Nathpa Jhakri Hydro Power Station (NJHPS) - the flagship power station of the Satluj Jal Vidyut Nigam (SJVN) - bore the brunt of heavily silt laden water, consisting of highly erosive Quartz particles, in the first few years of operation after commissioning in 2003-04. Through a series of silt control measures, based on expert advice and experience gained by SJVN over the years, SJVN is close to finding a lasting solution to theproblem towards achieving an optimum interval between successive repairs. In this paper, I will share the engineering and operation and maintenance experiences of SJVN and contrast the condition of critical underwater parts before and after implementingthe measures.
机译:通常,位于喜马拉雅河上的水力发电厂不得不忍受流经涡轮机的水中的高淤泥含量,从而对涡轮机的水下部分造成巨大破坏。水力发电公司致力于减轻这种威胁并优化发电量和利润。纳斯帕贾克里水电站(NJHPS)是Satluj Jal Vidyut Nigam(SJVN)的旗舰电站,在投入运行后的最初几年中,其淤泥淤积的水首当其冲,其中包含严重侵蚀性的石英颗粒。 2003-04。通过一系列的淤泥控制措施,基于SJVN多年来的专家建议和经验,SJVN接近为该问题找到持久的解决方案,以实现两次维修之间的最佳间隔。在本文中,我将分享SJVN的工程,运营和维护经验,并对比实施这些措施前后关键水下部件的状况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号