首页> 外文期刊>Water and Energy International >Accelerated placement of concrete - rotec system
【24h】

Accelerated placement of concrete - rotec system

机译:加速混凝土浇筑-ROTEC系统

获取原文
获取原文并翻译 | 示例
           

摘要

The Project envisaged construction of a concrete dam and a surface Power House on the right bank. The total quantity of concrete was 14.95 lakh cum. The details of the concrete quantities are summarized in Table 1. Omkareshwar Project was executed onturnkey basis by calling global tenders. The project was executed in 48 months which is a new industry bench mark.
机译:该项目设想在右岸修建混凝土大坝和地面动力房。混凝土总量为149.5十万克拉。表1汇总了具体数量的详细信息。Omkareshwar项目是通过调用全球招标以交钥匙方式执行的。该项目在48个月内执行完毕,这是一个新的行业基准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号