...
首页> 外文期刊>Water and Energy International >EFFICACY OF GROUTING IN HEAD RACE TUNNEL
【24h】

EFFICACY OF GROUTING IN HEAD RACE TUNNEL

机译:头部赛道灌浆的功效

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Chntact grouting is done to fill the cavities/voids between concrete and rock mass on account of shrinkage of concrete anduneven over breaks. Consolidation grouting is done to strengthen the surrounding rock mass by filling up the open joints, fissures, cracks etc. This paper deals with quality control assurance of the grouting operations (contact/consolidation) and permeability tests carried out in head race tunnel (HRT) of Tola Hydroelectric Project in Bhutan. Efficacy of grouting was determined by conducting permeability tests before and after consolidation grouting. Proper grouting of surrounding rock mass around the opening helps in monolithic behaviour of the rock mass. The quality assurance during grouting was ensured by checking the properties of all materials being used and by conducting permeability tests in pre/post grouting stage.
机译:由于混凝土的收缩和不均匀的断裂,进行了灌浆填充混凝土和岩体之间的空腔/空隙。进行固结灌浆,通过填满开口节,裂缝,裂缝等来加固围岩。本文涉及对注浆作业(接触/固结)的质量控制保证以及在顶跑道(HRT)中进行的渗透性测试不丹的托拉水力发电项目。通过在固结灌浆之前和之后进行渗透性测试来确定灌浆的有效性。在孔周围对周围岩体进行适当的灌浆有助于岩体的整体性能。通过检查所用所有材料的性能并在灌浆前/灌浆后进行渗透性测试,确保灌浆过程中的质量保证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号