...
首页> 外文期刊>Water and Energy International >ACCELERATION AND OPTIMISATION OF HYDROPOWER DEVELOPMENT IN PUNATSANGCHHU BASIN, BHUTAN
【24h】

ACCELERATION AND OPTIMISATION OF HYDROPOWER DEVELOPMENT IN PUNATSANGCHHU BASIN, BHUTAN

机译:不丹浦那桑楚盆地水电开发的加速与优化。

获取原文
获取原文并翻译 | 示例
           

摘要

Bhutan's ability to harness the hydropower resources has been made possible because of the close and friendly ties with its neighbour India. India has been providing both technical and financial assistance to develop the numerous hydropower projects in Bhutan. India has huge power shortage where as Bhutan has large hydropower potential. The relationship developed in the hydropower sector has been a win-win situation for both the countries.
机译:由于与邻国印度的密切友好联系,不丹利用水电资源的能力得以实现。印度一直在提供技术和财政援助,以发展不丹众多的水电项目。印度的电力短缺严重,不丹的水电潜力很大。在水电领域发展的关系对两国都是双赢的局面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号