...
首页> 外文期刊>Water and Energy International >NEA'S EXPERIENCE, LEANING AND CHALLENGES IN DEVELOPING CROSS BORDER INTERCONNECTION LINKS IN PARTICULAR REFERENCE TO DHALKEBAR-MUZAFFARPUR 400 KV CROSS BORDERINTERCONNECTION
【24h】

NEA'S EXPERIENCE, LEANING AND CHALLENGES IN DEVELOPING CROSS BORDER INTERCONNECTION LINKS IN PARTICULAR REFERENCE TO DHALKEBAR-MUZAFFARPUR 400 KV CROSS BORDERINTERCONNECTION

机译:NEA在开发跨界互连链路方面的经验,租赁和挑战,特别是针对DHALKEBAR-MUZAFFARPUR 400 KV跨界互连

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

HISTORY OF CROSS BORDER POWER EXCHANGE:Power exchange history Goes by some deeades-started along with signing of Koshi treaty in 1954.It was, however, in 1971 that Indo-Nepal Power exchange has commenced 5 MW in initial years.Current Arrangement of Cross Border Power Exchange:River Treaty: Koshi Treaty, Gandak Treaty and Mahakali Treaty.Contiguous Border Town Exchange Program;Commercial Power trading with PTC India during drv seasons.
机译:跨境电力交换的历史:电力交换的历史从1954年签署《科希条约》开始就开始了,但直到1971年,印度与尼泊尔的电力交换才在最初的几年中开始了5兆瓦的发展。边境电力交换:《河条约》:《库希条约》,《甘达克条约》和《马哈卡利条约》;连续的边境城镇交换计划;在干旱季节与PTC印度进行商业电力交易。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号