W & E RESEARCH DIGEST (WATER RESOURCES SECTION) Slope Protection of Subarnarekha Main Canal from RD 7950 m to RD 8720 m - An Alternative Approach

机译:W&E研究部(水资源部)Subarnarekha干渠从RD 7950 m到RD 8720 m的边坡防护-一种替代方法

获取原文
获取原文并翻译 | 示例
       

摘要

Subarnarekha multi-purpose river valley project is an Interstate Project which would benefit Jharkhand (erstwhile Bihar), Odisha and West Bengal. The head works i.e., Chandil Dam, Ichha Dam and Galudihi Barrage are located in Jharkhand to provide irrigation both to Odisha and Jharkhand, power to Jharkhand and flood control in West Bengal and Odisha. This interstate project was possible only after Tripartite agreement of 1978. For flood protection in Odisha, the State has already paid Rs. 665 crores (up to 2010-11) to Jharkhand towards the flood reserve space provided in the dam. Odisha would get irrigation from Jharkhand -Odisha border (i.e. Uchhagaon village) through Galudihi right bank canal. Though, excavation of the canal commenced during 1988-89 in Odisha portion, the lining of canal could not start in the head reach, i.e., from RD 7950 to RD 8720 m, due to slope failure since inception. Various alternatives have been tried times and again hut not yet successful. Unless the problem of slope failure in the said portion of canal is tackled effectively, canal in Odisha side cannot provide any irrigation, though major portion of canal in the downstream portion is complete. An attempt has been made in this paper for an alternative design considering all previous attempts.
机译:Subarnarekha多用途河流流域项目是一项州际项目,将使贾坎德邦(以前的比哈尔邦),奥里萨邦和西孟加拉邦受益。主要工程,即钱迪尔大坝,伊奇哈水坝和加卢迪希弹幕位于贾坎德邦,为奥里萨邦和贾坎德邦提供灌溉,贾坎德邦提供电力以及西孟加拉邦和奥里萨邦的防洪。仅在1978年三方协议达成后,该州际项目才有可能实现。对于奥里萨邦(Odisha)的防洪保护,国家已支付了卢比。到贾坎德邦(Jharkhand)达665千万卢比(截止2010-11年),用于大坝提供的洪水储备空间。奥里萨邦(Odisha)将通过贾卢迪(Galudihi)右岸运河从贾坎德邦-奥里萨邦边境(即Uchhagaon村)获得灌溉。尽管在奥里萨邦(Odisha)部分于1988-89年开始了运河的开挖,但由于衬砌从开工以来就出现了崩塌,因此运河的衬砌无法从头段开始(即从RD 7950到RD 8720 m)开始。各种选择已经尝试了一次,但仍然没有成功。除非有效解决运河在上述部分的斜坡破坏问题,否则奥里萨河一侧的运河无法提供任何灌溉,尽管下游部分的运河大部分已完成。本文已经尝试过考虑所有先前尝试的替代设计。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号