...
首页> 外文期刊>Water and Energy International >STABILITY OF SPILLWAY CUTSLOPE AT DHAULIGANGA H.E. PROJECT
【24h】

STABILITY OF SPILLWAY CUTSLOPE AT DHAULIGANGA H.E. PROJECT

机译:Dhauliganga H.E.溢洪道挖斗的稳定性项目

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The understanding of hill slope stability in the construction of hydro project depends upon the realistic approach of Geological investigation & cautious construction procedure. The careful appraisal and analysis of geotechnical data helps to chalk out the strategies for coping with various slope failures. Excavation of 150m high spillway cut slope of Dhauliganga project experienced various geotechnical problems due to complex geological setup and adverse topographical conditions. With successful application of state of the art technology, the problems were conquered with success. The high angle spillway cut slope necessitated with progressive change in the design of spillway by reducing its width and utilization of diversion tunnel as spillway tunnel. For the first time in Himalayan terrain, a reinforced anchored drift was constructed to stabilize the vulnerable spillway cutslope. The present paper deals with the several geological problems faced during the excavation of 150m high spillway cut slope of 280 MW Dhauliganga Project, St-I (Uttarakhand) and its remedial measures.
机译:对水利工程建设中山坡稳定性的认识,取决于地质调查和谨慎施工程序的现实方法。仔细评估和分析岩土数据有助于制定应对各种边坡破坏的策略。由于复杂的地质构造和不利的地形条件,Dhauliganga项目的150m高溢洪道切坡开挖遇到了各种岩土工程问题。随着最先进技术的成功应用,成功解决了这些问题。大角度溢洪道切面坡度需要通过逐渐减小溢洪道的宽度和减少将导流隧道用作溢洪道的方式来进行设计。首次在喜马拉雅山地形中建造了加固式锚固漂流,以稳定易损的溢洪道边坡。本文探讨了在St-I(Uttarakhand)的280兆瓦Dhauliganga项目150m高溢洪道切面开挖过程中面临的几个地质问题及其补救措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号