...
首页> 外文期刊>Water and Energy International >ENERGY AUDIT AND ENERGY CONSERVATION POTENTIAL FOR WATER TREATMENT PLANT
【24h】

ENERGY AUDIT AND ENERGY CONSERVATION POTENTIAL FOR WATER TREATMENT PLANT

机译:水处理厂的能源审计和节能潜力

获取原文
获取原文并翻译 | 示例
           

摘要

This paper present energy audit process on water treatment plant in Lalpur, Jabalpur M.P, here more effective equipment use for water purification/water distributed to Jabalpur area. Water treatment plant has been highly energy and cost intensive. Thewater treatment plant requires 8760 h per year of the total operating hours to produce 35405 mid (million litter per day). To achieve effective and efficient energy management scheme, thermal energy audit analysis was employed on water treatment plant.The industrial sector is the largest users of energy around the world and its share in the overall consumption is 49%. Energy is one of the major inputs for the economic development of any country. In the case of the developing countries, the energy sector assumes a critical importance in view of the ever-increasing energy needs requiring huge investments to meet them.
机译:本文介绍了Jabalpur M.P的Lalpur的水处理厂的能源审计过程,这是更有效的设备用于净水/分配给Jabalpur地区的水。水处理厂耗费大量能源和成本。该水处理厂每年的总运行时间为8760小时,以生产35405中间水(每天一百万只垃圾)。为了实现有效和高效的能源管理方案,对水处理厂进行了热能审核分析。工业是全球最大的能源用户,其在总能耗中所占的比例为49%。能源是任何国家经济发展的主要投入之一。就发展中国家而言,鉴于不断增长的能源需求需要巨大的投资来满足它们,因此能源部门至关重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号