During excavation of tunnels by drilling and blast method, the rock around the tunnel bore gets shattered to a certain depth. This will depend upon type of blasting as well as type ofsurrounding rock. Consolidation grouting is to consolidate the shattered rock by filling up the joints and discontinuities in the rock which got opened out during conventional blasting. Consolidation grouting improves the rock quality which will increase resistance of the rock for internal water pressure. Normally, it isbeing carried out from holes left in steel lining ferrules from inside the tunnel. THDCIL has adopted innovative Criss-Cross grouting around vertical penstocks of Koteshwar HE Project due to time and space constraint. Grouting around vertical penstocksfrom inside was creating problem to activities of Power House and Power intake due to space constraint. THDCIL had been working under a very tight commissioning schedule due to which it was planned that all the balance activities of Power House, Power intake and vertical penstocks are done as parallel activities.
机译:在通过钻孔和爆破方法开挖隧道的过程中,隧道孔周围的岩石破碎到一定深度。这将取决于爆破的类型以及围岩的类型。固结灌浆是通过填充在常规爆破中打开的岩石中的节理和不连续性来加固破碎的岩石。固结灌浆可以改善岩石质量,从而增加岩石对内部水压的抵抗力。通常,它是从隧道内部的钢衬套中留下的孔中进行的。由于时间和空间的限制,THDCIL已在Koteshwar HE项目的垂直压力管周围采用了创新的Criss-Cross灌浆。由于空间限制,从内部垂直竖管灌浆对动力室和动力输入的活动造成了问题。 THDCIL一直按照非常严格的调试时间表进行工作,因此计划将发电站,进水口和垂直压力管道的所有平衡活动作为并行活动进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号