首页> 外文期刊>Water Science and Technology >Retrofitting of Intermittent Decanted Extended Aeration (IDEA) plant for enhanced biological phosphorus removal
【24h】

Retrofitting of Intermittent Decanted Extended Aeration (IDEA) plant for enhanced biological phosphorus removal

机译:翻新间歇式扩展曝气(IDEA)设备以增强生物除磷能力

获取原文
获取原文并翻译 | 示例
       

摘要

The Intermittent Decanted Extended Aeration (IDEA) process developed over 30 years ago by the then NSW Department of public Works (DPW) provided substantial cost savings over the continuous activated sludge process. This is achieved by combining the process of aeration and sludge settlement in a single tank. The first IDEA plant was constructed at Adelong, NSW, in 1965. Since then over 100 plants have been built by DPW and Department of Land and Water Conservation (DLWC) for communities of a few hundred people to large regional centres serving over 50,000 people. This paper presents the latest development of incorporating enhanced biological phosphorus removal (EBPR) in the IDEA process. The retrofitting of 3 IDEA plants (capacity ranging from 4000 to 55000 persons) for EBPR is discussed. Different innovative and low cost solutions of incorporating conventional EBPR technology to the single tank IDEA plant are presented. Operational data including plant loading, effluent quality and sludge handling are also discussed.
机译:由新南威尔士州公共工程部(DPW)于30年前开发的间歇倾析式曝气(IDEA)流程比连续活性污泥流程节省了大量成本。这是通过在单个罐中结合曝气和污泥沉降过程来实现的。 IDEA的第一家工厂建于1965年,位于新南威尔士州的阿德隆。此后,DPW和水土保持部(DLWC)建造了100多个工厂,为数百人的社区提供服务,为超过50,000人提供服务的大型区域中心。本文介绍了在IDEA工艺中结合增强生物除磷(EBPR)的最新进展。讨论了为EBPR改造3个IDEA工厂(产能从4000到55000人)的问题。提出了将传统EBPR技术整合到单罐IDEA工厂中的不同创新和低成本解决方案。还讨论了包括工厂负荷,废水质量和污泥处理在内的运营数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号