Evaluation, selection and initial performance of a large scale centralised biosolids facility at Oxley Creek Water Reclamation Plant, Brisbane

机译:布里斯班Oxley Creek水回收厂的大型集中式生物固体设施的评估,选择和初期性能

获取原文
获取原文并翻译 | 示例
           

摘要

Recent upgrades to Brisbane City Council's Water Reclamation Plants (WRP) for improved nutrient removal has led to a significant increase in sludge production, and loss in potential anaerobic degradability. This increase in sludge production brought forth an economic driver for an improved, integrated biosolids handling strategy. The solution adopted by Brisbane Water, was a centralised thermal hydrolysis facility at Oxley Creek WRP to process the waste activated sludges generated at a total of five WRPs in the region. The thermal hydrolysis process uses high temperature and pressure to make non-degradable material more readily digestible by anaerobic bacteria and hence achieve greater efficiency in the overall anaerobic digestion process. Dewaterability is also improved, as the thermal hydrolysis process releases some of the bound water from the waste activated sludge. The viability of this solution is linked primarily to the reduction in mass and volume of biosolids which leads to lower transportation and disposal costs. After four months of operation, the Oxley Creek thermal hydrolysis plant has resulted in a 70% reduction in biosolids quantities ( bulk volume) and disposal costs. The process is currently being optimised. Savings to date have reached about AUD 80,000 per month. Technical and operational issues which emerged during commissioning are also described.
机译:布里斯班市议会的水回收厂(WRP)最近进行了升级,以改善营养去除效果,从而导致污泥产量显着增加,潜在的厌氧降解性下降。污泥产量的增加为改进的综合性生物固体处理策略带来了经济动力。布里斯班水公司采用的解决方案是Oxley Creek WRP的集中式热水解设施,用于处理该地区总共5个WRP产生的废物活化污泥。热水解过程使用高温和高压以使不可降解材料更易于被厌氧细菌消化,因此在整个厌氧消化过程中实现了更高的效率。脱水性也得到了改善,因为热水解过程会从废活性污泥中释放出一些结合水。该解决方案的可行性主要与减少生物固体的质量和体积有关,从而降低了运输和处置成本。经过四个月的运营,Oxley Creek热水解工厂使生物固体量(散装量)和处置成本降低了70%。该过程目前正在优化中。迄今为止,每月可节省约80,000澳元。还介绍了调试期间出现的技术和操作问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号