首页> 外文期刊>Water Science and Technology >10 years of operation of an integrated nutrient removal treatment plant: ups and downs. Background and water treatment
【24h】

10 years of operation of an integrated nutrient removal treatment plant: ups and downs. Background and water treatment

机译:综合营养去除处理设备运行10年:跌宕起伏。背景和水处理

获取原文
获取原文并翻译 | 示例
       

摘要

Water retention times less than 3 h from inlet to outlet were necessary to meet new effluent requirements without extending the footprint of the existing plant. Nitrogen removal was required at the existing, high loaded, direct precipitation plant and space was not readily available. The staff at the VEAS WWTP took on the task to design a new process at their own risk. Selected solutions and ups and downs in the water treatment during the past 10 years of operations and further developments are presented in this paper. Always asking for well-proven solutions might make life easy. The intent of this paper is to encourage some of our colleagues to be more daring in their approach to new challenges. However, expect sleepless nights in order to solve the unexpected problems along the way.
机译:为了满足新的废水要求,同时又不增加现有工厂的占地面积,从入口到出口的保水时间必须少于3小时。现有的高负荷直接沉淀工厂需要脱氮,而且空间尚不可用。 VEAS污水处理厂的员工承担了设计新流程的任务,风险自负。本文介绍了过去10年的运营中水处理的选定解决方案以及它的起伏和进一步的发展。总是寻求经过验证的解决方案可能会让生活变得轻松。本文的目的是鼓励我们的一些同事更加勇于面对新挑战。但是,请期待不眠之夜,以便解决沿途的意外问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号