首页> 外文期刊>VGB KraftwerksTechnik >Work planning for maintenance activities control of operation costs considering specific requirements of a waste-to-energy plant
【24h】

Work planning for maintenance activities control of operation costs considering specific requirements of a waste-to-energy plant

机译:维护活动的工作计划,考虑到垃圾发电站的特定要求,控制运营成本

获取原文
获取原文并翻译 | 示例
       

摘要

The combined generation on waste incineration offers economic advantages enabling the about 60 adjacent industrial businesses and neighbouring suburbs to be supplied with energy at a favourable cost level, despite the high operating costs incurred by the thermal utilization of domestic and similar industrial waste (residual waste). With the scheduled new materials for boilers, the operators expect an increased operating time for waste boilers as well as an increase of the operating safety. Results of the test operation with new materials are described.
机译:垃圾焚烧的联合发电具有经济优势,尽管热利用生活垃圾和类似工业垃圾(残余垃圾)会产生高昂的运营成本,但仍可以以有利的成本水平向约60个邻近的工业企业和周边郊区提供能源。使用预定的锅炉新材料,运营商期望废锅炉的运行时间增加,同时操作安全性也会提高。描述了使用新材料进行测试的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号