...
首页> 外文期刊>VGB KraftwerksTechnik >Schkopau power station-design, construction and initial operating experience
【24h】

Schkopau power station-design, construction and initial operating experience

机译:Schkopau电站-设计,建造和初始运行经验

获取原文
获取原文并翻译 | 示例

摘要

Commercial operation of the brown coal-fired power station at Schkopau commenced on programme on April 1, 1996, on Unit A and on October 1, 1996, on Unit B. Following the design, construction and commissioning phase extending over five years,Schkopau became the first plant with supercritical steam conditions and an efficiency of about 40% in the new states. The operating results show that the emission levels are significantly below the permitted values and availability is developingsatisfactorily at a constantly increasing rate. This paper presents the plant concept, experience from the construction phase and initial results from commissioning and operation.
机译:Schkopau褐煤电厂的商业运行始于1996年4月1日的A机组和1996年10月1日的B机组。经过长达五年的设计,建造和调试阶段,Schkopau成为了第一家拥有超临界蒸汽条件的工厂,在新州的效率约为40%。运行结果表明,排放水平显着低于允许值,并且可用性正在以不断提高的速度令人满意地发展。本文介绍了工厂的概念,建设阶段的经验以及调试和运营的初步结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号