首页> 外文期刊>Turf Central >High water level a high priority: drainage upgrade is first step in Lincoln Greens' renovation
【24h】

High water level a high priority: drainage upgrade is first step in Lincoln Greens' renovation

机译:高水位是重中之重:排水系统升级是林肯绿党改造的第一步

获取原文
获取原文并翻译 | 示例
           

摘要

Starting at the beginning is usually better than starting in the middle for successful completion of any project. That's the approach being used at Lincoln Greens Golf Course in Springfield, Ill. A new irrigation system was to be the first step in amaster plan to restore Lincoln Greens, with a 700,000 dollar budet set aside to replace the Rain Bird Maxi system. Springfield Recreation owned the 240-acre course until a merger last fall between Springfield Park District and Springfield Recreation.
机译:对于成功完成任何项目,从头开始通常比从头开始更好。那是在伊利诺伊州斯普林菲尔德的林肯格林斯高尔夫球场所采用的方法。一种新的灌溉系统将是恢复林肯格林斯的总体计划的第一步,并拨出了70万美元的资金用于替换Rain Bird Maxi系统。 Springfield Recreation拥有240英亩的土地,直到去年秋天Springfield Park District和Springfield Recreation合并为止。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号