...
首页> 外文期刊>Valve World >Keeping Braskem PP5 on track; An interview with inspection engineer Roberto Funger
【24h】

Keeping Braskem PP5 on track; An interview with inspection engineer Roberto Funger

机译:保持Braskem PP 5的正常运行;检验工程师Roberto Finger的访谈

获取原文
获取原文并翻译 | 示例
           

摘要

The Braskem petrochemical refinery near the town of Duque de Caxias is nestled amidst humid green hills less than an hour's drive from Rio de Janeiro, Brazil. The sprawling site hosts several chemical plants involved in the production of raw materials and further processed chemical products including polypropylene and polyethylene. Valve World visited the site to speak with Mr. Roberto Funger, Senior Inspection Engineer in the Maintenance Department at the refinery. The Braskem petrochemical site includes three different plants. The large UNIB 4 plant receives Ethane and propane from a neighbouring Petrobras site. This is processed through furnaces which refine the gas to produce the raw material for polyethylene and polypropylene. Polyethylene is produced in unit PE9 and polypropylene is produced in PP5. Small quantities of by-products such as gasoline are also produced on site.
机译:位于杜克·德·卡克夏斯(Duque de Caxias)镇附近的Braskem石化炼油厂坐落在潮湿的绿色山丘中,距离巴西里约热内卢不到一个小时的车程。分布广泛的站点托管着几家化工厂,这些化工厂涉及原材料和进一步加工的化学产品,包括聚丙烯和聚乙烯。 Valve World参观了现场,并与炼油厂维护部门的高级检查工程师Roberto Funger先生进行了交谈。 Braskem石化厂包括三种不同的工厂。 UNIB 4大型工厂从相邻的Petrobras站点接收乙烷和丙烷。这是通过炉子进行处理的,这些炉子可以精炼气体以生产聚乙烯和聚丙烯的原料。聚乙烯在PE9中生产,聚丙烯在PP5中生产。现场还会产生少量副产品,例如汽油。

著录项

  • 来源
    《Valve World》 |2016年第7期|共2页
  • 作者

    Joanne McIntyre;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 TH134.1;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号