首页> 外文期刊>Valve World >Procurement challenges require careful consideration
【24h】

Procurement challenges require careful consideration

机译:采购挑战需要认真考虑

获取原文
获取原文并翻译 | 示例
           

摘要

This is the first in a series of articles which Valve World intends to run, focusing on the procurement of process equipment by purchasing executives with engineering design and construction companies. The procurement function in an oil and gas industry engineering design firm has changed dramatically since the last great energy boom in the early 1980s. Many of the challenges are similar, yet there are marked differences as well. Perhaps the greatest challenge in today's marketplace is related to steel delivery, regardless of whether it is pressure vessel quality plate, alloy steel castings, mild steel forgings and shapes. For the past few years, this shortage was driven by what has been referred to as "The China Effect", caused by that nation's burgeoning economy and exploding demand for raw materials to fuel both internal consumption and expanding export.
机译:这是Valve World打算撰写的系列文章中的第一篇,着重于通过与工程设计和建筑公司的高管采购来采购过程设备。自1980年代初的上一次能源大繁荣以来,石油和天然气工业工程设计公司的采购职能发生了巨大变化。许多挑战是相似的,但也存在明显的差异。当今市场上最大的挑战可能与钢的交付有关,无论是压力容器质量的钢板,合金钢铸件,低碳钢锻件和形状。在过去的几年中,这种短缺是由所谓的“中国效应”驱动的,该效应是由于该国经济蓬勃发展以及对原材料的需求激增以推动内部消费和扩大出口。

著录项

  • 来源
    《Valve World》 |2006年第4期|共2页
  • 作者

    Ted L. Kelly;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 TH134.1;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号