There are numerous problems here: 1) unknown condensate pressure; 2) possible boiler-water corrosion issues; 3) an indication of capacity overload; 4) possible two-phase flow in the 6-in. vent header; 5) steam at multiple pressures added to a steam header; and 6) un-insulated pipe where condensation can occur. The best solution to this problem is to continue walking down the pipe; get very familiar with the isometrics. Typically, these drawings are a mess. Create accurate drawings. Collect pressure and temperature data. Use an infrared gun to verify which traps aren't working. Identify the sources of the steam, which should give you the pressures. Measure the pressure at the suction side of the condensate pump. Re-calculate the capacity of the flash drum and discuss your findings with one of the steam equipment companies.
机译:这里存在许多问题:1)冷凝水压力未知; 2)可能的锅炉水腐蚀问题; 3)容量过载的指示; 4)6英寸中可能存在两相流。排气头5)将多种压力的蒸汽添加到蒸汽集管中; 6)可能发生冷凝的非绝缘管道。解决此问题的最佳方法是继续沿管道行走。对等轴测图非常熟悉。通常,这些图纸是一团糟。创建准确的工程图。收集压力和温度数据。使用红外枪验证哪些陷阱不起作用。确定蒸汽的来源,应该给您带来压力。测量冷凝水泵吸入侧的压力。重新计算闪蒸罐的容量,并与一家蒸汽设备公司讨论您的发现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号