...
首页> 外文期刊>Transportation Professional >Bypass takes shape on solid foundations
【24h】

Bypass takes shape on solid foundations

机译:旁路在坚实的基础上成型

获取原文
获取原文并翻译 | 示例
           

摘要

Availability of good local materials is benefitting a new bypass which - when it opens later this year -should ease traffic flows around the M40's Junction 15. Anew embankment of red soil up to 9m high can now be seen clearly from roads west of Warwick. The earthworks, with two major and numerous smaller structures also taking shape, will soon form the 'M40 Junction 15 (Longbridge) Bypass', allowing A46 through traffic to bypass the junction. This is a very significant " project for traffic flows in the area and a scheme close to a good source of fill material. Just to the west of the route of the new bypass Morrison Construction has been able to 'borrow' around 500,000m{sup}3 of Weathered Keuper Marl good for road building. This has proven a great boost for the Highways Agency's Longbridge Bypass scheme, which was expected to be supplied with fill from the Toll Bar Roundabout improvement further north along the A46.
机译:优质本地材料的供应正在使一条新的旁路受益。该旁路将于今年晚些时候开放,它将缓解M40交界处15周围的交通流。现在,从沃里克以西的道路上可以清楚地看到高达9m高的新红土路堤。土方工程也即将成形,其中有两个主要的众多小型结构,它们将很快形成“ M40交汇点15(长桥)旁路”,使A46穿越交通可以绕过交汇点。这是一个非常重要的“该地区交通流量项目,并且是一个很好的填充材料来源的计划。就在新旁路的路线以西,莫里森建筑公司已经能够'借用'大约500,000m {sup } 3条风化的Keuper Marl很好地用于公路建设,这对公路局的长桥绕行计划提供了极大的推动作用,预计该收费区将由A46往北更远的Toll Bar Roundabout改善处提供。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号