首页> 外文期刊>Transmission & Distribution World: The Information Leader Serving the Worldwide Power-Delivery Industry >SRP Enhances Reliability of Underground Distribution Cable: Cable injection technology addresses problems with an aging URD infrastructure
【24h】

SRP Enhances Reliability of Underground Distribution Cable: Cable injection technology addresses problems with an aging URD infrastructure

机译:SRP增强了地下配电电缆的可靠性:电缆注入技术解决了URD基础设施老化的问题

获取原文
获取原文并翻译 | 示例
       

摘要

Salt River Project (SRP) has been using cable injection technology to treat crosslinked polyethylene (XLPE) cables since 1998, during which time more than 2.5 million ft (762 km) of underground residential distribution (URD) cable has been successfully treated. Nearly 99% of the treated cable has remained in service and failure free.
机译:自1998年以来,盐河项目(SRP)就一直使用电缆注入技术来处理交联聚乙烯(XLPE)电缆,在此期间,成功处理了超过250万英尺(762公里)的地下住宅配电(URD)电缆。经过处理的电缆中有将近99%仍在使用且无故障。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号