【24h】

AEP develops sound right-of-way program

机译:AEP开发完善的通行权计划

获取原文
获取原文并翻译 | 示例
       

摘要

American Electric Power (AEP, Columbus, Ohio, U.S.) manages vegetation on more than 186,000 miles (299,338 km) of distribution and 33,800 miles (54,396 km) of transmission lines in an 11-state operating area. The company's service territory, which stretches from Virginia to Texas, features wide variations in topography, line access and vegetation conditions. Additional challenges include the differing approaches to deregulation by 11 states, a shrinking labor pool, an increasing number of city and state ordinances, and a variety of management requirements for state and federally owned lands. To successfully meet these challenges, AEP has adopted a strategy of employing a wide variety of vegetation management techniques and contracting methods, while also emphasizing stewardship on the lands crossed by its rights-of-way (R/Ws). AEP's vegetation management program focuses on safety, service reliability, cost effectiveness and environmental stewardship. To accomplish these goals, AEP employs an integrated vegetation management program that seeks to optimize and balance these issues by using a variety of maintenance techniques to fit local needs and unique situations.
机译:美国电力公司(AEP,美国俄亥俄州哥伦布)在11个州的运营区域中管理着超过186,000英里(299,338公里)的配电线路和33,800英里(54,396公里)的输电线路。该公司的服务范围从弗吉尼亚州延伸到德克萨斯州,在地形,线路通道和植被条件方面具有广泛的变化。其他挑战包括11个州采取不同的放松管制方式,不断缩减的劳动力,越来越多的城市和州令以及对州和联邦土地的各种管理要求。为了成功应对这些挑战,AEP采取了一种采用多种植被管理技术和承包方法的策略,同时还强调在其通行权(R / Ws)越过的土地上进行管理。 AEP的植被管理计划专注于安全性,服务可靠性,成本效益和环境管理。为了实现这些目标,AEP采用了一项综合的植被管理计划,该计划通过使用各种维护技术来满足当地需求和独特情况,以优化和平衡这些问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号