Pole testing ensures high reliability and long life: hydro-quebec pilot project verifies result of field-test methods

机译:磁极测试可确保高可靠性和长寿命:魁北克魁北克水电试验项目验证了现场测试方法的结果

获取原文
获取原文并翻译 | 示例
       

摘要

Electric utilities are placing increasing emphasis on cost-effectively extending the life of existing facilities while maintaining adequate levels of safety and reliability. In the case of overhead lines, utilities face the problem of aging wood poles (most will reach the end of their "design life" over the next 10 to 20 years) combined with tight capital and maintenance budgetary requirements. Furthermore, since the mid-1990s, more telecommunications, cable television, internet and wireless carriers in the United States and Canada are seeking to expand their markets by attaching their equipment and cables to utility poles. Most in-service wood pole lines were not designed to carry this additional hardware and are overloaded beyond their original safety factors.
机译:电力公用事业越来越重视经济有效地延长现有设施的使用寿命,同时又要保持足够的安全性和可靠性。在架空线的情况下,公用事业面临木质杆老化的问题(大多数将在未来10至20年内达到其“设计寿命”的终点),同时资本和维护预算要求也很严格。此外,自1990年代中期以来,美国和加拿大的更多电信,有线电视,互联网和无线运营商都在寻求通过将其设备和电缆连接到电线杆上来扩大市场的机会。大多数在役的木杆线并非设计为可携带这种额外的硬件,并且过载时超出了其最初的安全系数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号