Northern utilities optimize lightning arrester placement

机译:北方电力公司优化避雷器的位置

获取原文
获取原文并翻译 | 示例
       

摘要

In 1994, Minnkota Power (Grand Forks, North Dakota, U.S.) embarked on a program to improve power quality within its system. The scope of the project was to provide a method of increasing system reliability by reducing lightning-caused outages. The initial plan was to add lightning arresters to the existing 69-kV transmission lines, add fault-locating distance relays and use a realtime lightning-detection system. Arrester and relay installation began in 1995, and by 1999, Minnkota Power had installed 30 fault-locating distance relays and more than 360 miles (579 km) of arresters to its transmission lines. The utility used the real-time lightning-detection system for one year before it was discontinued because of limited application. When Minnkota Power implemented the initial plan, it decided it would review the program after a couple of years to determine its effectiveness and to make any necessary modifications or changes. The utility conducted preliminary studies in 1996 and 1999, and more complete analysis in 2001. This current study contains five years of lightning and operations data from 1996 to 2000.
机译:1994年,Minnkota Power(美国北达科他州格兰德福克斯)开始实施一项计划,以改善其系统内的电能质量。该项目的范围是提供一种通过减少雷电引起的停机来提高系统可靠性的方法。最初的计划是在现有的69 kV输电线路上增加避雷器,增加故障定位距离继电器,并使用实时雷电检测系统。避雷器和继电器的安装始于1995年,到1999年,Minnkota Power已在其传输线上安装了30个故障定位距离继电器和360英里(579公里)以上的避雷器。该实用程序使用了实时雷电检测系统一年,然后才因应用受限而停止使用。 Minnkota Power实施最初的计划时,决定在几年后对计划进行审核,以确定其有效性并进行必要的修改或变更。该公司在1996年和1999年进行了初步研究,并在2001年进行了更全面的分析。该研究包含1996年至2000年的五年闪电和运行数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号