【24h】

MLGW Eliminates Long Lead Times

机译:MLGW消除了较长的交货时间

获取原文
获取原文并翻译 | 示例
       

摘要

Strategic alliances help Memphis Light, Gas and Water Division maintain order and delivery schedules of critical equipment. Imagine being the person within an electric utility who is responsible for electric substations and the power transformers within them. The weather forecast calls for severe thunderstorms and tornadoes. That evening it begins to rain heavily. Lightning is flashing everywhere. The phone rings in the middle of the night. The foreman of the transformer maintenance group is on the other end of the line giving word that a power transformer has failed. Questions begin cascading through the mind: Is there a spare transformer available to use? Where is it located? How long will it take for crews to place the spare transformer in service? Luckily, there is a spare stored at another substation across town. Problem solved.
机译:战略联盟可帮助孟菲斯轻,天然气和水务部门维持关键设备的订单和交付时间表。想象一下,作为电力公司内负责变电站及其内部电力变压器的人员。天气预报要求有雷暴和龙卷风。那天晚上开始下大雨。到处都是闪电。电话在深夜响起。变压器维护组的领班在线路的另一端,表示电源变压器发生了故障。头脑中开始出现疑问:是否有备用变压器可用?它在哪里?机组需要多长时间将备用变压器投入使用?幸运的是,有一个备用零件存储在镇上的另一个变电站中。问题解决了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号