首页> 外文期刊>Transmission & Distribution World: The Information Leader Serving the Worldwide Power-Delivery Industry >Linemen Respond Rapidly to Restore Power: PPL Electric Utilities' linemen and contract crews safely rebuild lines after Hurricane Sandy's high winds obliterate infrastructure
【24h】

Linemen Respond Rapidly to Restore Power: PPL Electric Utilities' linemen and contract crews safely rebuild lines after Hurricane Sandy's high winds obliterate infrastructure

机译:巡线员迅速响应以恢复电力:飓风桑迪的狂风摧毁了基础设施后,PPL电力公司的巡线员和合同人员安全地重建了线路

获取原文
获取原文并翻译 | 示例
       

摘要

Hurricane Sandy unleashed its wrath on the Northeast, knocking out power to more than 523,000 of PPL Electric Utilities' 1.4 million customers. Dubbed the worst storm in the utility's history, the hurricane affected all 29 Pennsylvania counties served by the utility, and the hardest-hit areas were in the eastern part of the service territory from Bucks and Montgomery counties up through the Lehigh Valley and into the Poconos.
机译:桑迪飓风在东北地区引起了轩然大波,给PPL公用事业公司的140万用户中的523,000多家客户断电。飓风被称为公用事业历史上最严重的风暴,飓风影响了公用事业服务的宾夕法尼亚州所有29个县,受灾最重的地区位于服务区的东部,从雄鹿县和蒙哥马利县一直延伸到Lehigh谷并进入Poconos 。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号