【24h】

Allegheny power realigns to do more with less

机译:阿勒格尼力量重新调整,事半功倍

获取原文
获取原文并翻译 | 示例
           

摘要

Today's electric power industry, like many others, is challenged by change. New residential and business communities demand utility access and delivery. Utility requirements in existing communities increase or decrease as populations shift. Even without these changes, utilities must maintain generation and delivery systems on a planned-project basis. Established more than 100 years ago, Allegheny Power (Greensburg, Pennsylvania, U.S.) is certainly no stranger to these challenges. Today, Allegheny Power provides low-cost energy to 3.5 million consumers, plus thousands of commercial and industrial customers, in an area that is centered in western Pennsylvania and spreads into parts of Maryland, Ohio, Virginia and West Virginia.
机译:与其他许多行业一样,当今的电力行业也面临着变化的挑战。新的住宅和商业社区要求公用事业的接入和交付。随着人口的转移,现有社区的公用事业需求增加或减少。即使没有这些更改,公用事业公司也必须在计划项目的基础上维护发电和交付系统。建立于100多年前的Allegheny Power(美国宾夕法尼亚州格林斯堡)对这些挑战并不陌生。如今,阿勒格尼电力公司(Allegheny Power)在宾夕法尼亚州以西部为中心,并向马里兰州,俄亥俄州,弗吉尼亚州和西弗吉尼亚州的部分地区提供了350万消费者以及数以千计的商业和工业客户的低成本能源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号