首页> 外文期刊>Transmission & Distribution World: The Information Leader Serving the Worldwide Power-Delivery Industry >Testing Prevents Surge in Arrester Failures: For more than 30 years, Manitoba Hydro has been testing surge arresters on delivery at installation and during operation
【24h】

Testing Prevents Surge in Arrester Failures: For more than 30 years, Manitoba Hydro has been testing surge arresters on delivery at installation and during operation

机译:测试防止避雷器故障激增:30多年来,曼尼托巴水电公司一直在安装,运行期间交付时测试避雷器

获取原文
获取原文并翻译 | 示例

摘要

SURGE ARRESTERS ARE OFTEN OVERLOOKED WHEN PERFORMING POWER FACTOR TESTS on transformers, breakers and other apparatus in a substation. Oftentimes, the testers are aware of how a transformer or a breaker functions but unaware of the intended purpose of the surge arresters. Because there are no moving parts to maintain or an oil sample to pull, it is often policy not to perform any arrester testing.
机译:在变电站的变压器,断路器和其他设备上进行功率因数测试时,经常会避开急速避雷器。通常,测试人员会意识到变压器或断路器的工作原理,但并未意识到电涌放电器的预期用途。因为没有可移动的部件要维护或没有油样可拉,所以通常的策略是不执行任何避雷器测试。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号