Stepping Up Distribution

机译:加强分销

获取原文
获取原文并翻译 | 示例
       

摘要

Facing a transmission line rerouting situation, El Paso Electric decides to feed a transmission line with a distribution source, requiring innovative engineering. Land developers asked El Paso Electric Co. (EPE) to reroute a portion of a radial 115-kV transmission line that feeds the town of Hatch, New Mexico, U.S., for aesthetic reasons. The old transmission line was obscuring the magnificent pinnacles of the Organ Mountains. Rerouting the 115-kV transmission line with no customer interruptions was going to be a challenge, considering it was a radial line in a remote area with no other high-voltage sources nearby. After some resourceful brainstorming, EPE decided to source the line from the distribution system. This brought on a host of technical issues that would need to be resolved before the distribution system was ready to connect to the 115-kV line, but EPE was determined to make it work. Fulfilling this request would allow EPE to modernize this transmission line with steel structures but presented two initial challenges. First, the remaining radial transmission line had to be fed from a distribution source for three months while rerouting took place. Second, the radial transmission line had to be reconfigured safely without customer outages.
机译:面对输电线路的重新路由情况,埃尔帕索电气公司决定为输电线路提供配电电源,这需要创新的工程设计。土地开发人员出于美学原因,要求埃尔帕索电气公司(EPE)重新路由向美国新墨西哥州哈奇镇供电的115 kV径向输电线路的一部分。旧的传输线掩盖了器官山的宏伟峰峦。考虑到这是一条偏远地区的径向线路,附近没有其他高压电源,因此在不中断客户的情况下重新布线115 kV输电线将是一个挑战。经过一些头脑风暴后,EPE决定从配电系统采购线路。这带来了许多技术问题,在配电系统准备连接到115 kV线路之前,需要解决这些技术问题,但是EPE决心使其正常工作。满足此要求将使EPE用钢结构对这条传输线进行现代化改造,但提出了两个初始挑战。首先,在进行重新路由时,其余的径向传输线必须从分配源馈送三个月。其次,径向传输线必须安全地重新配置,而不会造成客户中断。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号