首页> 外文期刊>Transactions of the Canadian Society for Mechanical Engineering >TRANSIENT THERMO-STRESS FIELD OF BRAKE SHOE DURING MINE HOIST EMERGENCY BRAKING
【24h】

TRANSIENT THERMO-STRESS FIELD OF BRAKE SHOE DURING MINE HOIST EMERGENCY BRAKING

机译:矿井提升制动过程中制动蹄的瞬态热应力场

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper, the finite element (FE) model of the three-dimensional (3-D) transient thermo-stress field of a brake shoe was established and then the software ANSYS 13.0 was used to get the numerical solutions; an experiment was carried out on the X-DM friction tester to verify the FE model. It was found that both the whole temperature and the equivalent stresses of the brake shoe increased and then decreased during mine hoist emergency braking; region of 1 to 3 mm below the friction surface was suffered to larger temperature gradients and stresses.
机译:建立了闸瓦的三维(3-D)瞬态热应力场的有限元模型,然后使用软件ANSYS 13.0进行了数值求解。在X-DM摩擦测试仪上进行了实验,以验证FE模型。结果发现,在矿井提升机紧急制动过程中,制动蹄的整体温度和等效应力均先升高后降低。摩擦表面以下1到3 mm的区域承受较大的温度梯度和应力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号