...
首页> 外文期刊>Ti02 Worldwide Update >3,Kumba Takes Full Control of Ticor
【24h】

3,Kumba Takes Full Control of Ticor

机译:3,Kumba完全控制Ticor

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The concentrator at Tiwest's North mine was relocated during H1 2005.Three chlorinator rebuilds were carried out at the Kwinana pigment plant during H1 2005;normally only three chlorinator rebuilds would be required during a full year.But Tiwest's half-year pigment production was only slightly reduced.
机译:Tiwest北部矿的选矿厂在2005年上半年进行了搬迁.2005年上半年,Kwinana颜料厂进行了三台加氯机改造;通常一整年只需要进行三台加氯机改造,但Tiwest半年的颜料产量只有少量减少。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号