首页> 外文期刊>TIN World >Malachite plans boosted
【24h】

Malachite plans boosted

机译:孔雀石计划得到加强

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Plans by Australian miner Malachite Resources for generating cash flow by mining of alluvial tin at Elsmore, near Inverell in northern NSW, have been given a major boost by the results of metallurgical test work recently undertaken for the Company in Germany. The company has announced that it has received encouraging results from new metallurgical test work, involving dry processing, conducted on a bulk sample of the Karaula Lead alluvial tin depositl at the University of Aachen in Germany. Managing Director, Garry Lowder, summed up the new results by saying: "This is a very promising step forward for our Elsmore Project and it has been well worth waiting for. The biggest problems in wet processing alluvial deposits generally are getting hold of enough water in the first place and then disposing of the slimes generated in washing the alluvium afterwards.
机译:澳大利亚矿业公司孔雀石资源公司计划通过在新南威尔士州北部因弗雷尔附近的埃尔斯莫尔开采冲积锡来产生现金流的计划,大大推动了该公司最近在德国进行的冶金测试工作。该公司宣布,通过对包括在德国亚琛大学的Karaula Lead冲积锡矿床的大量样品进行的干法加工在内的新冶金测试工作,获得了令人鼓舞的结果。常务董事加里·劳德(Garry Lowder)在总结新结果时表示:“这对我们的埃尔斯莫尔(Elsmore)项目是非常有希望的一步,值得等待。湿法冲积沉积物的最大问题通常是掌握足够的水。首先要处理掉随后冲积物产生的粘液。

著录项

  • 来源
    《TIN World》 |2009年第27期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 有色金属冶炼;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号