...
首页> 外文期刊>The Korea Metal Journal >Dae Sung Special Pipe Postpones Introduction of Seamless Steel Pipe Production Facilities Again
【24h】

Dae Sung Special Pipe Postpones Introduction of Seamless Steel Pipe Production Facilities Again

机译:大成特殊钢管再次推迟无缝钢管生产设备的引进

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Dae Sung Special Pipe, a local maker of drawn steel pipes, has postponed the introduction of new tubing facilities of seamless steel pipes again from a period between July and August to February next year. Dae Sung Special Pipe, which had originally set its target for the introduction of those facilities at the end of last year, put off the imports of them by six months due to the failure of Russian supplier in meeting the original delivery period, but the company has become to postpone the facility introduction period once more.
机译:当地的拉制钢管生产商大成特殊钢管已从明年7月至8月至明年2月再次推迟了无缝钢管新管材设施的引进。大成特殊钢管原定于去年年底开始引进这些设施,但由于俄罗斯供应商未能满足最初的交货期,推迟了六个月的进口时间,但该公司再次推迟了设备的引入期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号