首页> 外文期刊>The Northern Miner. >Rubicon plans 80,000-metre drill program at Phoenix
【24h】

Rubicon plans 80,000-metre drill program at Phoenix

机译:Rubicon计划在凤凰城进行80,000米的钻探计划

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

After intersecting mineralization in a number of stepout holes at its Phoenix gold project in Red Lake, Ont, Rubicon Minerals (RMX-T, RBY-X) is substantially expanding its exploration program. Scheduled to last 12 months, Rubicon is planning to drill 80,000 metres at Phoenix, both underground and from surface. One or two rigs will drill 20,000 metres from surface, while the remainder will be drilled from underground, starting with two rigs, then expanding to four.
机译:在其位于安大略省红湖的菲尼克斯金矿项目中,在多个阶梯孔中矿化相交之后,Rubicon Minerals(RMX-T,RBY-X)大大扩展了其勘探计划。 Rubicon计划持续12个月,计划在Phoenix地下和地面钻探80,000米。一两个钻机将从地面钻出20,000米,而其余钻机将从地下钻,从两个钻机开始,然后扩展到四个。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号