...
首页> 外文期刊>The Northern Miner. >Livengood results lift International Tower Hill
【24h】

Livengood results lift International Tower Hill

机译:Livengood的成绩提升了国际塔山

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A long, well-mineralized intercept from its Livengood gold project in Alaska had International Tower Hill Mines (ITH-V, THM-X) up as much as 35 percent in recent trading. Results from the first seven holes drilled this year at Livengood include 199.6 metres grading 1.38 grams gold per tonne starting at just 10.7 metres depth. The long interval, in hole 8, included a shorter 30.5-metre section of 4.11 grams gold. An infill hole, hole 8 was collared near the southeast corner of the Lillian zone.
机译:在阿拉斯加的利文古德金矿项目中,经过长时间矿化处理后,国际塔山矿山(ITH-V,THM-X)在最近的交易中上涨了35%。今年在利文古德(Livengood)钻出的前七个孔的结果包括199.6米,从每吨深仅10.7米处开始开采出每吨1.38克黄金。孔8中较长的间隔包括较短的30.5米段(4.11克金)。在莉莲带东南角附近有一个填充孔,孔8。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号