...
首页> 外文期刊>The Northern Miner. >Peregrine launches winter program on Tli Kwi Cho
【24h】

Peregrine launches winter program on Tli Kwi Cho

机译:百富勤在Tli Kwi Cho推出冬季计划

获取原文
获取原文并翻译 | 示例
           

摘要

When cash calls to its joint-venture partners went unanswered in December, Peregrine Diamonds (PGD-T) increased its stake in the WO diamond project in the Northwest Territories and, in turn, the DO-27 pipe to 71.74 percent from 54.47 percent, at the expense of Aber Diamond (ABZ-T, ABER-Q), SouthernEra Diamonds (SDM-T, SDMFF-O) and DHK Diamonds. The WO property centres on the DO-27 and DO-18 kimberlite pipes that comprise the infamous Tli Kwi Cho kimberlite complex. As the operator, Peregrine has been advancing the project through scoping level studies. From June 2005 to November 2006, the joint-venture partners spent almost 19 million dollars in their assessment.
机译:12月,对合资伙伴的现金呼吁无人接听时,Peregrine Diamonds(PGD-T)扩大了在西北地区WO钻石项目中的股份,并将DO-27管道从54.47%增至71.74%,以Aber Diamond(ABZ-T,ABER-Q),SouthernEra Diamonds(SDM-T,SDMFF-O)和DHK Diamonds为代价。 WO属性集中在臭名昭著的Tli Kwi Cho金伯利岩综合体的DO-27和DO-18金伯利岩管道上。作为运营商,Peregrine通过范围界定研究来推进该项目。从2005年6月到2006年11月,合资伙伴花费了近1900万美元进行评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号