...
首页> 外文期刊>The International Journal of Advanced Manufacturing Technology >Optimal production run length and maintenance schedule for a deteriorating production system
【24h】

Optimal production run length and maintenance schedule for a deteriorating production system

机译:不断恶化的生产系统的最佳生产运行时间和维护计划

获取原文
获取原文并翻译 | 示例
           

摘要

This study considers manufacturing cost, inventory holding cost, system setup and maintenance costs, restoration cost, and warranty cost to a deteriorating production system whose state can be classified into in-control or out-of-control state at any time. This study develops a framework of simultaneous determination of optimal production run length and maintenance schedule and shows that there exists a unique optimal production run length and scheduled maintenance policy that minimize the expected total cost per item. The mathematical conditions to the optimal production run length and scheduled maintenance policy for a production cycle are deduced.
机译:这项研究考虑了不断恶化的生产系统的制造成本,库存持有成本,系统设置和维护成本,恢复成本以及保修成本,这些生产系统的状态可以随时分为受控状态或失控状态。这项研究建立了同时确定最佳生产运行长度和维护计划的框架,并表明存在一个独特的最佳生产运行长度和计划的维护策略,可将每件预期的总成本降至最低。推导了针对最佳生产周期的数学条件和针对生产周期的计划维护策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号