...
首页> 外文期刊>The International Journal of Advanced Manufacturing Technology >A fuzzy possibilistic bi-objective hub covering problem considering production facilities, time horizons and transporter vehicles
【24h】

A fuzzy possibilistic bi-objective hub covering problem considering production facilities, time horizons and transporter vehicles

机译:考虑生产设施,时间范围和运输车辆的模糊可能的双目标枢纽

获取原文
获取原文并翻译 | 示例

摘要

This paper presents a novel fuzzy possibilistic biobjective model for a hub covering location-allocation problem with specific features. Considering two major objectives is the main novelty of this problem, comparing to the previous studies. The first objective is to minimize the total costs consisting of (1) covering costs, (2) transportation costs, (3) opening costs of facilities in hubs, (4) reopening costs of facilities in hubs, (5) activating costs of facilities in hubs, and (6) transporters purchasing costs. The second objective is to minimize the sum of the times of shipping commodities by transporters from the origin node to the destination node via hubs. Furthermore, to come closer to reality, the main parameters of the proposed mathematical model are regarded as fuzzy ones. To solve the proposed multi-objective model, four recent approaches are used and the results are compared with each other.
机译:本文针对具有特定特征的枢纽覆盖位置分配问题,提出了一种新颖的模糊可能性双目标模型。与以前的研究相比,考虑两个主要目标是该问题的主要新颖之处。第一个目标是使总成本最小化,包括(1)覆盖成本,(2)运输成本,(3)枢纽设施的开放成本,(4)枢纽设施的重新开放成本,(5)设施激活成本在枢纽,以及(6)运输商的采购成本。第二个目标是最大程度地减少运输商通过集线器从始发节点到目的地节点的运输时间。此外,为了更接近现实,所提出的数学模型的主要参数被认为是模糊参数。为了解决所提出的多目标模型,使用了四种最新方法,并将结果进行了比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号