首页> 外文期刊>The Fabricator >HOW TO BOOST FIRST-PASS TRANSFER EFFICIENCY IN POWDER COATING
【24h】

HOW TO BOOST FIRST-PASS TRANSFER EFFICIENCY IN POWDER COATING

机译:如何在粉末涂料中提高一次通过的传输效率

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Lean manufacturing principles are not limited to fabricating activities on the shop floor. They apply to powder coating as well. Of course, the goal of any lean manufacturer is to eliminate waste, and that should be the goal of any shop running a powder coating line. It's best to get as much powder to cling to the metal part on the first pass (see Figure 1), so that the part can go immediately to the curing oven, not to another staging area where someone has to spend time touching up specific areas.
机译:精益生产原则不仅限于在车间进行制造活动。它们也适用于粉末涂料。当然,任何精益生产商的目标都是消除浪费,这应该是任何运行粉末涂料生产线的车间的目标。最好在第一道工序中获得尽可能多的粉末附着在金属零件上(参见图1),以便使零件可以立即到达固化炉,而不是另一个需要有人花时间修整特定区域的临时区域。 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号