...
首页> 外文期刊>The Corn And Soybean Digest >MORE GRAIN HEADS WEST: WILL THIS FIRST NEW U.S. EXPORT ELEVATOR IN DECADES SHIFT THE CORN BELT WESTWARD?
【24h】

MORE GRAIN HEADS WEST: WILL THIS FIRST NEW U.S. EXPORT ELEVATOR IN DECADES SHIFT THE CORN BELT WESTWARD?

机译:西边有更多的粮食:这是美国第一个十足的新出口电梯,将玉米带向西转移吗?

获取原文
获取原文并翻译 | 示例
           

摘要

EGT's brand-new export terminal at Longview, Wash., sets new standards for efficiency. "With grain so valuable, no one wants to leave it sitting in the field at risk, so the speed with which you can move it from field, to storage, to its destination is important," says CEO Larry Clarke. "The facility we have constructed can unload 110-car shuttle trains in about five hours. That's three to five hours faster than our nearest competition, and we can unload without breaking the train apart.
机译:EGT位于华盛顿州朗维尤(Longview)的全新出口终端为效率设定了新标准。首席执行官拉里·克拉克(Larry Clarke)表示:“由于谷物如此珍贵,没有人愿意将其置于野外,因此,从田间,仓库到目的地的运输速度至关重要。” “我们建造的设施可以在大约5个小时内卸下110辆班车列车。这比我们最近的竞争对手要快3到5个小时,而且我们可以在不分解列车的情况下进行卸载。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号