首页> 外文期刊>The Asia Miner >Mine design for Hongyu phosphate
【24h】

Mine design for Hongyu phosphate

机译:mine design for hong与phosphate

获取原文
获取原文并翻译 | 示例
           

摘要

A MINE design is being prepared for Sterling Group Ventures' Hongyu Phosphate Project in Hunan Province. A mine safety evaluation is also being prepared with both of these studies needing to be approved by different levels of government before work can begin. The studies were expected to be completed by the end of October and if all approvals, including water and electricity agreements, are received promptly, mine construction and immediate production from development headings could begin around the end of the year.
机译:正在为Sterling Group Ventures在湖南省的宏宇磷酸盐项目准备矿山设计。矿山安全评估也正在准备之中,这两项研究都需要得到各级政府的批准才能开始工作。研究预计将在10月底完成,如果及时获得包括水和电协议在内的所有批准,矿山建设和开发项目的立即生产将在今年年底左右开始。

著录项

  • 来源
    《The Asia Miner》 |2011年第6期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿业工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号