首页> 外文期刊>The Asia Miner >KEMCO prpjects on a fast track
【24h】

KEMCO prpjects on a fast track

机译:KEMCO项目进展迅速

获取原文
获取原文并翻译 | 示例
           

摘要

SOUTHEAST Asia Mining Corp has put the KEMCO lead-zinc-silver properties in Thailand on a fast track permitting process as it aims to begin producing at the two former operating mines. The company has refurbished a mill, is updating an Nl 43-101 report, is carrying out near-mine exploration, including drilling, and is confident of receiving the mining permit renewal in 2012. The Kanchanaburi Exploration and Mining Co (KEMCO) joint venture properties include the past operating Boh Yai and Song Toh mines as well as the Song Toh flotation plant with daily capacity of 1200 tonnes. The property is in west Thailand and is on a major regional fault structure that extends more than 200km into Myanmar. The two past producing mines are 19km apart, while the former Padaeng mine and operating smelter is also in the region.
机译:东南亚矿业公司计划在泰国的KEMCO铅锌银矿产进入快速审批流程,其目的是开始在两个先前运营的矿山中进行生产。该公司已经翻新了一家工厂,正在更新Nl 43-101报告,正在进行包括采矿在内的近矿勘探,并有信心在2012年获得采矿许可证的续签。北碧勘探与采矿公司(KEMCO)合资企业这些资产包括过去运营的Boh Yai和Song Toh矿山以及Song Toh浮选厂,日产能为1200吨。该物业位于泰国西部,位于主要的区域断层结构上,延伸至缅甸200多公里。过去的两个生产矿山相距19公里,而前Padaeng矿山和运营中的冶炼厂也在该地区。

著录项

  • 来源
    《The Asia Miner》 |2011年第6期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿业工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号