首页> 外文期刊>Chemweek's business daily >M&G Chemicals' UuS PTA-PET project ahead of schedule
【24h】

M&G Chemicals' UuS PTA-PET project ahead of schedule

机译:M&G Chemicals的UuS PTA-PET项目提前完成

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

M&G Chemicals (Luxembourg) is pushing ahead with its purified terephthalic acid-polyethylene terephthalate (PTA-PET) project at Corpus Christi, TX, and the company plans to start commercial operations in 2016, industry sources say. This would be roughly one year earlier than the timing projected by the industry. M&G is taking advantage of modular construction techniques that enable large sections of the plant to be constructed overseas and delivered by ship to the site for final assembly, sources add.
机译:业内消息人士称,M&G Chemicals(Luxembourg)正在推进其在德克萨斯州科珀斯克里斯蒂市的纯化对苯二甲酸-聚对苯二甲酸乙二醇酯(PTA-PET)项目,该公司计划于2016年开始商业运营。这将比该行业预计的时间提前约一年。消息人士补充说,M&G正在利用模块化建造技术,该技术可使工厂的大部分区域在海外建造并通过船运到现场进行最终组装。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号