首页> 外文期刊>Chemweek's business daily >Boardwalk to resume full commercial operations on Evangeline pipeline this week
【24h】

Boardwalk to resume full commercial operations on Evangeline pipeline this week

机译:木板路本周将恢复伊万杰琳管道的全面商业运营

获取原文
获取原文并翻译 | 示例
           

摘要

Boardwalk Pipeline Partners (Houston) says that its Evangeline ethylene pipeline is expected to resume partial commercial operations today and full commercial operations on 17 June at a US Department of Transportation Pipeline and Hazardous Materials Safety Administration (PHMSA)-approved reduced pressure of 1131. The company says that a full return to the maximum operating pressure of 1336 is still dependent on several factors including final in-line inspection reports and completion of all PHMSA corrective action order requirements.
机译:Boardwalk Pipeline Partners(休斯敦)表示,其Evangeline乙烯管道预计将在今天恢复部分商业运营,并于6月17日在美国运输管道和有害物质安全管理局(PHMSA)批准的1131减压下恢复全部商业运营。该公司表示,要完全恢复到1336的最大工作压力,仍然取决于几个因素,包括最终的在线检查报告以及所有PHMSA纠正措施订单要求的完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号