Korea East-West Power Co. (EWP) has issued two long-term tenders (EWP-Coal-2015-LT03/LT04) for thermalcoal due by July 24 The contractual period for LT03 is for four and half a year during October 2015 and March 2020. EWP willprocure 0.28 million mt for the first six month, and 0.42 million mt per annum for the rest of the term.
展开▼