首页> 外文期刊>TEX Energy Report >Roof Raising For LNG Tank At Hachinohe Terminal Is Scheduled For Sept
【24h】

Roof Raising For LNG Tank At Hachinohe Terminal Is Scheduled For Sept

机译:八户码头LNG储罐的屋顶升高计划于9月开始

获取原文
获取原文并翻译 | 示例
           

摘要

At Hachinohe LNG Import Terminal, which JX Nippon Oil and Energy Corporation are constructing, the roof raising work for LNG storage tank is scheduled to be carried out around this September. The roof assembled at the bottom of the tank will be raised to the top by using the air pressure within the tank. When the work is finished, it is considered that 50% of the working schedule to build LNG storage tank has been completed. After that, the interior work will start. The tank inside wall will be attached by refrigerant.
机译:JX日本石油和能源公司正在建造的八户LNG进口码头,LNG储罐的顶棚工作计划于今年9月左右进行。利用水箱内的气压,将安装在水箱底部的车顶升高到顶部。当工作完成时,认为建造LNG储罐的工作计划已完成50%。之后,内部工作将开始。储罐内壁将被制冷剂附着。

著录项

  • 来源
    《TEX Energy Report》 |2012年第31期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号