首页> 外文期刊>TEX Energy Report >Press Release- Coalspur Mines Completion Of The Pre Feasibility Study On Vista Coal Project -
【24h】

Press Release- Coalspur Mines Completion Of The Pre Feasibility Study On Vista Coal Project -

机译:新闻稿-Vistapur煤炭项目的预可行性研究完成后,Cosspur矿完成-

获取原文
获取原文并翻译 | 示例
           

摘要

Western Australia: Coalspur Mines Limited is pleased to announce the completion of the Pre Feasibility Study (“PFS”) on the Company's flagship Vista Coal Project (“VCP”). The PFS was undertaken by Wardrop, a Tetra Tech company (“Wardrop”), one of North America's leading coal industry engineering consulting firms. The PFS defined a 31 year mine life producing approximately 9.0 million tonnes per annum (“Mtpa”) of saleable coal from the processing of approximately 18.0Mtpa of run of mine (“ROM”) coal.
机译:西澳大利亚州:Cosspur Mines Limited非常高兴地宣布完成了公司旗舰Vista Vista Coal项目(“ VCP”)的预可行性研究(“ PFS”)。 PFS由Tetra Tech公司(“ Wardrop”)(北美领先的煤炭工业工程咨询公司之一)负责。 PFS定义了31年的矿山寿命,通过处理约18.0Mtpa的矿山(“ ROM”)煤,每年产生约900万吨可售煤。

著录项

  • 来源
    《TEX Energy Report》 |2010年第15期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号