首页> 外文期刊>Przeglad Gorniczy >Underground railway in Warsaw. State of the 1~(st) line construction and prospects of further development
【24h】

Underground railway in Warsaw. State of the 1~(st) line construction and prospects of further development

机译:地下铁路在华沙。一号线建设的现状及进一步发展的前景

获取原文
获取原文并翻译 | 示例

摘要

The Warsaw underground rallway is so far the only underground building engineering object realised on so large scale in Poland since 1983. Since the beginning of the underground construction the Authors used to describe particular stages of construction in materials for the traditionally organised scientific-technical conferences in the Mining and Metallurgy Academy in Cracow. The reference list enables the interested in to recollect main problems of the construction included in the particular reference items. In this paper a broad view of main problems and issues connected with the construction of the 1~(st) line of the underground executed by mining and open-cut methods is presented.
机译:自1983年以来,华沙地下高架索道是波兰迄今为止唯一实现如此大规模的地下建筑工程的对象。自地下建筑开始以来,作者曾用传统的科学技术大会描述材料的特定建造阶段。克拉科夫矿业冶金学院。该参考列表使有兴趣的人能够回忆起具体参考项目中所包括的构造的主要问题。本文对与采矿和明挖法实施的地下1〜(st)线施工有关的主要问题和问题进行了概括性介绍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号