...
首页> 外文期刊>UK McCloskey's Powerfocus >Fellside gets a transplant
【24h】

Fellside gets a transplant

机译:Fellside接受移植

获取原文
获取原文并翻译 | 示例

摘要

The 168MW combined hear and power (CHP) plant alongside rhe Sellafield nuclear fuel re-processing plant and the former Calder Hall and Windscale nuclear power plants in Cumbria, is to get a retro-fit of new control systems. The CHP plant was built in 1993 and operated as a CCGT power plant during its early days fired by natural gas purchased from British Gas under a long-term interruptible (LTI) tariff. The plant was originally constructed to replace Calder Hall in supplying electricity and steam for the nuclear re-processing plant. When it was commissioned, Calder Hall continued to operate for several years, and the Fellside plant was able to operate near to baseload selling power to Scottish Hydro-Electric and later Scottish and Southern Energy.
机译:168兆瓦的联合听力和电力(CHP)电厂,塞拉菲尔德核燃料后处理厂以及坎布里亚郡的前Calder Hall和Windscale核电厂,将对新的控制系统进行改造。该热电联产电厂建于1993年,初期以CCGT发电厂运行,由英国天然气公司以长期可中断(LTI)价位购买天然气作为燃料。该工厂最初是为了代替Calder Hall为核后处理厂供应电力和蒸汽而建造的。当Calder Hall投入运行时,它继续运营了几年,而Fellside工厂得以在接近基本负荷的情况下运营,向苏格兰水力发电以及后来的苏格兰和南部能源出售电力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号