首页> 外文期刊>U.S. Coal Review >It's going to take a lot of NRG, but plethora of coal plants eyed
【24h】

It's going to take a lot of NRG, but plethora of coal plants eyed

机译:这将需要大量的NRG,但是有很多燃煤电厂注视着

获取原文
获取原文并翻译 | 示例
           

摘要

NRG Energy provided more details on its plan to develop approximately 10,500 megawatts of new generation capacity that will include construction of coal-fired power or expansion of coal-fired capacity at existing facilities in Texas as well as the Northeast and South Central regions of the country. The repowering initiative, which will be funded with the support of partners and project finance debt, would represent a total investment of 16 billion dollars. The plan would enhance NRG's dispatch mix with almost 8,000 megawatts of new baseload capacity - including 2,700 megawatts of nuclear. Here is a glance at the plans for each region: The state's demand growth is among the strongest in the nation and requires new plant construction to ensure reliability of service in the region, NRG said. NRG's repowering plan includes adding 3,500 megawatts of new baseload capacity using both coal and nuclear fuel, as well as 500 megawatts of gas-fired peaking capacity.
机译:NRG Energy提供了有关计划开发约10,500兆瓦的新一代发电能力的计划的更多详细信息,其中包括在得克萨斯州以及该国东北和南部中部地区的现有设施中建设燃煤发电或扩大燃煤发电能力。这项重振能源计划将在合作伙伴的支持下提供资金,并承担项目融资债务,总投资额为160亿美元。该计划将通过增加近8000兆瓦的新基本负荷容量(包括2700兆瓦核能)来增强NRG的调度组合。这是每个地区的计划一览表:NRG说,该州的需求增长是美国最强劲的国家之一,需要新建工厂以确保该地区服务的可靠性。 NRG的电力重装计划包括使用煤和核燃料增加3500兆瓦的新基本负荷容量,以及500兆瓦的燃气调峰容量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号