...
首页> 外文期刊>U.S. Coal Review >Tucson Electric Power to add fourth coal-fired unit at Springerville plant
【24h】

Tucson Electric Power to add fourth coal-fired unit at Springerville plant

机译:图森电力将在斯普林格维尔工厂增加第四台燃煤机组

获取原文
获取原文并翻译 | 示例
           

摘要

A fourth unit will be added to Tucson Electric Power's Springerville generating station, expanding the availability of coal-fired power in the region. Salt River Project (SRP), a Phoenix-based utility, will own the 400-MW unit and control its output. The unit is expected to begin commercial operation in late 2009. The new unit will stand alongside Springerville Unit 3, which is under construction and is expected to be placed online during the third quarter of this year. That 400-MW unit will be leased from a financial owner by Tri-State Generation & Transmission Association, a wholesale power cooperative that will control the unit's output. Tucson Electric will operate both new units along with the two existing 380-MW units at SGS.
机译:图森电力公司的Springerville发电站将增加第四个机组,以扩大该地区燃煤发电的可用性。总部位于凤凰城的公用事业盐河项目(SRP)将拥有400兆瓦机组并控制其输出。该装置预计将于2009年下半年开始商业运营。新装置将与Springerville 3号装置并排,该装置正在建设中,预计将于今年第三季度投入使用。这台400兆瓦的机组将由Tri-State Generation&Transmission Association(一家国有电力批发组织)从金融所有者那里租借,该协会将控制该机组的输出。图森电气将在SGS运营两个新机组以及两个现有380 MW机组。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号